Skip to content
TECS Environmental

TECS Environmental

Environmental Compliance Services

Menu

  • Home
  • Storm Water Programs
    • Development Construction Program
    • Development Planning Program
    • Illicit Connections and Illicit Discharge Elimination Program
    • Public Agency Activities Program
    • Industrial/Commercial Facilities Control Program
    • Storm Water Ordinance
    • Los Angeles County Municipal NPDES Permit
    • TMDL Programs
    • Public Information
  • Links
  • Contact
TECS Environmental

Public Agency Activities Program

Table of Contents  
Introduction
Section 1  Sewage Systems Operations
Section 2  Public Construction Activities Management
Section 3  Vehicle Maintenance/Material Storage Facilities Management
Section 4  Landscape and Recreational Facilities Management
Section 5  Storm Drain Operation and Management
Section 6  Streets and Roads Maintenance
Section 7  Parking Facilities Management
Section 8  Public Industrial Activities Management
Section 9  Emergency Procedures
Section 10  Treatment Feasibility Study
LIST OF TABLES
     1       Permit Requirements – Public Agency Activities
     1-1   Permit Requirements – Sewage Systems Operations
     2-1   Permit Requirements – Public Construction Activities Management
     2-2   Minimum Water Quality Protection Requirements for Public Agency
              Development Construction Projects
     2-3   Storm Water Pollution Controls for Construction
     3-1   Permit Requirements – Vehicle Maintenance/Material Storage Facilities
              Management
     4-1   Permit Requirements – Landscape and Recreational Facilities Management
     5-1   Permit Requirements – Storm Drain Operation and Management
     6-1   Permit Requirements – Streets and Roads Maintenance
     7-1   Permit Requirements – Parking Facilities Management
     8-1   Permit Requirements – Public Industrial Activities
     9-1   Permit Requirements – Emergency Procedures
     10-1   Permit Requirements – Treatment Feasibility Study
LIST OF FIGURES
     2-1   Flow Diagram for Determination of Project as Priority or Exempt
     2-2   Planning Priority/Exempt Checklist
     2-3   Construction Control Measures
LIST OF APPENDICES
     A  Excerpts from Permit
     B  Sewage Systems Operations Guidance
     C  Recommended BMPS for Site Planning, Post-Construction, and Redevelopment/Infill
     D  BMP Selection Criteria
     E  Public Construction Activities Management Guidance
     F  Vehicle Maintenance/Material Storage Facilities Management Guidance
     G  Landscape and Recreational Facilities Management Guidance
     H  Storm Drain Operation and Management Guidance
     I  Streets and Roads Maintenance Guidance
     J  Parking Facilities Management Guidance
     K  Emergency Procedures Guidance
Copyright © 2025 TECS Environmental. All rights reserved. Theme Spacious by ThemeGrill. Powered by: WordPress.